EPC and engineering contractor in Iraq
Engineering, procurement and construction under one contract, from design to commissioning, delivered by an Iraqi company that has acted as prime contractor on EPC scopes.
Enermax takes engineering, procurement and construction responsibility for industrial and oilfield scopes in Iraq. Our in-house civil, structural, mechanical and electrical engineers assess each project and respond in full to your scope of work, or help you write it.
On the procurement side, we source internationally through vendor networks in the UAE, the United States, China, India, Europe, the UK, Kuwait and Saudi Arabia, then clear customs, obtain movement permits and deliver to site. Construction is carried out by our own crews, with steel fabrication, cranes and heavy transport.
We delivered the produced water treatment and water injection expansion, Phase I, at West Qurna-2 as prime contractor for SICIM (September 2022 to August 2023), inside an operating field and under the client's HSE requirements.
What our EPC scope covers
Engineering
Civil, structural, mechanical and electrical assessment, design input and full response to your scope of work.
Procurement
Supplier selection, competitive pricing, material management, customs clearance and movement permits.
Steel fabrication and erection
Steel structures for process facilities, warehouses, towers and platforms.
Mechanical installations
Piping, pumps, water treatment and water injection systems.
Electrical and substations
AIS/GIS switchgear and transformers up to 400 kV, cabling, protection, testing and commissioning.
Civil works
Reinforced concrete, pre-cast, foundations, roads, site preparation and demolition.
EPC and construction work in Iraq
| Project / scope | Client | Period | Location |
|---|---|---|---|
| Produced water treatment and water injection expansion, Phase I (EPC, prime) | SICIM | 2022 – 2023 | West Qurna-2 |
| 132 kV gas-insulated substation, installation and commissioning | SICIM | 2017 | West Qurna-2 |
| Camp electrical works: supply of power lines | SICIM | 2020 – 2021 | West Qurna-2 |
| Pipe laying and inspection | Lukoil Mideast Iraq | 2016 – 2017 | West Qurna-2 |
How we work
- Scope and site surveyWe review your scope of work or RFQ, ask the right questions and visit the site where access allows.
- Clear, itemised quotationA firm price with every assumption written down, plus a mobilization schedule, staffing plan and HSE approach.
- MobilizeVetted crews, inspected equipment, permits and site access arranged, and every task covered by a written procedure.
- Deliver and reportDaily supervision, client sign-off, monthly KPI reporting and fast correction of any deficiency.
Frequently asked questions
Have you acted as prime contractor on an EPC project in Iraq?
Yes. We delivered the produced water treatment and water injection expansion, Phase I, at West Qurna-2 as prime contractor for SICIM (2022–2023).
Can you procure equipment that is not available in Iraq?
Yes. We source through vendor networks in the UAE, the United States, China, India, Europe, the UK, Kuwait and Saudi Arabia, and handle customs and movement permits.
Do you work on lump-sum contracts?
Yes. The 132 kV substation at West Qurna-2 was installed, tested and commissioned on a lump-sum basis in 2017.
Tell us what your project needs
Send your scope of work or RFQ. We reply within one working day.